IST at South India
Telangana - Kothagudem
Solar Engineering, Business Corporate and Installation Training for youth and professionals from
Telangana -
Kurnool, Deosugur, Mahbubnagar, Nalgonda, Hyderabad, Kothagudem, Suryapet, Warangal, Jangaon, Siddipet, Nariapur, Karimnagar, Pamunuru, Nizamabad,
150 MW (AC) SOLAR PV POWER PLANT AT SCCL, TELANGANA
The proposed Solar powered plants are to set up at various areas of SCCL, i.e., in the districts of Bhadradri Kothagudem, Peddapalli, Mancherial districts of Telangana State.BHEL will be setting up the plants on EPC basis at four locations in the state including 50 MW plant at Ramagundam in Peddapalli district, 39 MW plant at Yellandu, 30 MW plant at Manuguru in Bhadradri Kothagudem district and 10 MW plant at Pegadapally in Jagtial district. With the addition of this order, the solar portfolio of BHEL has increased to over 710 MW.
In June 2018, the state-run company had won two orders, worth more than Rs 1.25 billion, for installing 30 MW of solar PV power plant projects on EPC basis in the sate of Gujarat.
BHEL has created capability in key segments of PV value chain that include PV modules, solar cells and power conditioning systems and units.
Besides solar PV projects, the company provides entire EPC solutions from concept to commissioning for off-grid as well as grid-interactive SPV power projects in several parts of the country, including Andaman & Nicobar Islands and Lakshadweep.
The government-owned entity is also in discussion with several international lithium ion battery manufacturers for setting up a manufacturing plant in the country. The company is expected to have a 20 per cent stake in the manufacturing plant, whereas the other partner will have a majority share.
SOLAR POLICY FOR Telangana - Residential, Commercial & Industrial
Net metering is a billing system that allows rooftop owners having solar system installed at their rooftop to sell any excess electricity generated from solar system to local electricity utility
Voltage Level:
240 V (single Phase) : upto 5 kWp max.
415V (Three phase): Above 5 to 75 kWp max
High Tension (HT) : Above 75 kWp
Conditions:= 80% of your Sanctioned Load
Cumulative capacity of all solar systems installed in your area shall not exceed 50% of Local Distribution transformer capacity at LT level
Telangana targets to connect 5,000 MW of solar power to grid by 2022
Telangana has been the frontrunner in generating solar power in the country and going forward with plans to stay ahead of other States.
It moved from being a power-deficit State to ending power cuts within just six months of formation. And according to top officials,
the State is planning to add an additional 473 MW of solar power to the existing 3,336 MW connected to grid.
The State had set an ambitious target of connecting 5,000 MW of solar power to grid by 2022.
Karnataka topped the installed solar energy capacity chart at 5.16 GW followed by Telangana at 3.4GW and Andhra Pradesh at 2.56 GW as on July 31, 2017, the minister noted.
The country is on track to comfortably achieve the target of 100 GW of solar capacity by 2022.
Are you want to install solar at your home/office/factory? Yes, solar panels can be a good investment for homes, offices, and factories.
Contact with our Consultant