Ballari Solar Project

10 mw solar plant at Tirupati in AP

Vikram Solar commissioned a 10 mw solar plant at Tirumala Tirupati Devasthanams land in Andhra Pradesh. The project has been developed under the PPA scheme between Tirumala Tirupati Devasthanams (TTD) and Vikram Solar Pvt Ltd,

Current installed capacity, including rooftop, is 300 MW.
A meeting of the State Cabinet, presided by Chief Minister Siddaramaiah, on Tuesday approved the changes in the policy to encourage harnessing solar energy. The States solar energy potential is estimated in excess of 24,700 MW.

As per the tariff policy and targets fixed by MNRE, the solar energy should constitute eight per cent of the total energy consumption, excluding hydro energy by March 2022. The policy of the Centre envisages that 40 per cent of the solar generation should be through rooftop, Law and Parliamentary Affairs T.B. Jayachandra told presspersons.

The solar generation would be limited to 200 MW per taluk from all sources of generation excluding projects implemented on roof top. Such projects should be allocated on first-come-first-serve basis for various categories identified under clause 8 of the solar policy.




Offline classroom class Sep - 2025 at Howrah (Kolkata), West Bengal


Quick Inquiry Form

Select Mail Subject *
Select Course *
Select Course Mode *
Select Admission For *
Full Name *
Email ID *
Full Address *
Zip/Pin Number *
WhatsApp No (with country code)*




Are you Professional? *
Select Years of Experience *
Describe your needs/Future Plan *

IST Prestigious Alumni Feedback

IST alumni have achieved significant success, gained recognition, or made notable contributions in PV Solar and Renewable energy areas.

SURAJIT THAKUR

This Course is comprehensive and covers all technical and commercial aspect of Solar PV. It gives depth knowledge of understanding PV solar project from ROOP TOP to MW scale project. IST is a great institute to learn solar PV technology course.

- SURAJIT THAKUR,
Purba Bardhaman, West Bengal, India
Team Lead at TATA POWER SOUTHERN ODISHA DISTRIBUTION LIMITED

Profile: https://www.linkedin.com/in/surajit-thakur-3b457014/ FaceBook Page: Purba Bardhaman, West Bengal, India
Achintya Bharat

IST is a great place to learn the Solar Technology and Solar business both, as it provides a very hands on instruction to not just learn but create and scale up solar business enterprise.

- Achintya Bharat,
Gwal Pahari, Gurgaon
DDIN ENTERPRISES

Profile: https://www.linkedin.com/in/achintya-bharat/ FaceBook Page: Gwal Pahari, Gurgaon
SUBAS CHANDRAN

Excellent presentation and professors are rich in knowledge Thanks to Sanjib sir , for being kind and makes us to utilise the session effectively

- SUBAS CHANDRAN,
Chennai, Tamil Nadu, India
Technical Sales Manager at iPLON India

Profile: https://www.linkedin.com/in/subas-chandran-8b6652229/overlay/1635497783357/single-media-viewer/?profileId=ACoAADk5_4oBsFELh2DSXyX8Z6FYHwFPSuqeoRE
Sitav Bhadra

The course gives an overall feel of the subject. The practical measurement and installation, and covering of all the elements of the PV system.

- Sitav Bhadra,
Kolkata, West Bengal, India
Founder of Sunforest, Renewable Energy Consultant

Profile: https://www.linkedin.com/in/sitav-bhadra-8a1169a7/details/certifications/
TAJUDDIN AHAMED

To be honest all of the topics covered in the lectures were very informative and therefore the information itself very valuable due to its practicality. IST is a Organized institute, E Library is very helpful.

- TAJUDDIN AHAMED,
Rajarhat, West Bengal, India
Construction Engineer National Power Construction Corporation Ltd

Profile: https://www.linkedin.com/in/tajuddin-ahamed-73538a191/



Andhra Pradesh SOLAR POLICY - Residential, Commercial & Industrial

1. NET METERING -
Capacity =1 MWp

Voltage Level:
Upto 56 kW, LT Level
Above 56 kW to 1 MW, HT 11/33 kV
Conditions:
Cumulative capacity of all solar systems installed in your area shall not exceed 60% of Local Distribution transformer capacity at LT level and 100% at HT level.


10,000 MW solar power in State by 2022

The State government has chalked out plans to add 10,000 MW solar power in the State by 2022, to help bring down tariff as well as make Andhra Pradesh a power-surplus State. The government has already taken up 4,000 MW ultra solar power projects at Kurnool, Anantapur and Kadapa.

The government has been promoting renewable energy, including solar, in a big way since 2014. The price per unit has come down to 2.75 due to solar power generation. The solar power tariff has come down after taking up the 750 MW solar power project in the Kadapa ultra mega solar park. The government could add 2,440 MW solar power capacities during the last four years. It started with 63.70MW in 2014-15, and added 369.90 MW in 2018-19.

The solar policy was announced in 2015 to attract investments in the renewable energy sector. "As a result of promotional efforts, the cumulative renewable energy capacity in the State has reached 7,119 MW, which includes 2,517 MW of solar power," he says.


Practical Training Photo Gallery

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Interactive Classes

Interactive Classes

Practical & Doubt Classes

Practical & Doubt Classes

E-Library Study Materials

E-Library Study Materials

Online Examination

Online Examination



footer