Kottayam Solar Project

Kerala Releases Tender For Solar Power Plants worth 12 MW
The Steel Industries Kerala Limited has announced that it has released tender inviting bids for setting up of two on-grid solar PV power plants in Kidangoor Gram Panchayat in Kottayam, Kerala. The last date of bid submissions is February 18, 2019, and the bid opening date has been scheduled for February 20, 2018.

All bidders will be requisite to present an Earnest Money Deposit of Rs 25,000 along with their bids. The projected cost of the project is Rs 9,00,000 and the selected bidders will have 45 days to execute the project.

The two solar rooftop plants of 9 kW and 3 kW capacity will be set up at the Gram Panchayat of Kidangoor in the Kottayam District of Kerala. To be entitled, the bidders should have prior experience in accomplishing related projects and the experience certificate should be uploaded along with the bids.



Offline classroom class Aug - 2025 at Howrah (Kolkata), West Bengal


Quick Inquiry Form

Select Mail Subject *
Select Course *
Select Course Mode *
Select Admission For *
Full Name *
Email ID *
Full Address *
Zip/Pin Number *
WhatsApp No (with country code)*




Are you Professional? *
Select Years of Experience *
Describe your needs/Future Plan *

IST Prestigious Alumni Feedback

IST alumni have achieved significant success, gained recognition, or made notable contributions in PV Solar and Renewable energy areas.

Palwinder Singh

IST is well organized training institute and trainers are well knowledgeable.In a very short span of time we gain a lot of knowledge about solar PV system. Live design calculations was very helpful. Providing excellent knowledge on different scenarios.

- Palwinder Singh,
Amritsar, Punjab, India
Electrical Engineer in FATA EPC, in Oman UAE Qatar Bahrain

Profile: https://www.linkedin.com/in/palwinder-singh-560b0759/
Deepti Garhia

Thanks IST, we could learn and do this course during the lockdown. The teaching method that I have found most useful thus far in the course - Online teaching with diagrams ,E-library books and class video

- Deepti Garhia,
New Delhi, Delhi, India
Teacher at Army/ Navy School

Profile: https://www.linkedin.com/in/deepti-garhia-260abb1b4/
Jayesh Kharat

The course took me from no knowledge of PV systems to doing PV System Design and installation. Providing lots of examples and practical scenarios. Excellent.

- Jayesh Kharat,
Dubai, United Arab Emirates
Consultant at Thirdware Solution Ltd

Profile: https://www.linkedin.com/in/jayeshkharat/details/certifications/
Chandru Neginahal

Joined this course with zero knowledge and also with very excitement to learn. Classes are conducted in very professional manner as per schedule. All the aspects of Solar PV are covered in step by step approach which helped to understand more easily. Lot of training material are shared for online study. Very happy at the end of this course as my learning objectives are met with expectation. I will be happy to Recommend this course to others Thank You Sir.

- Chandru Neginahal,
Bengaluru, Karnataka
Principal Software Engineer at Infineon Technologies

Profile: https://www.linkedin.com/in/chandru-neginahal-0b433a12/ FaceBook Page: Bengaluru, Karnataka
Kurra Prashanth

Excellent. This course was really useful

- Kurra Prashanth,
Nellore, Andhra Pradesh, India

Profile: https://www.linkedin.com/in/kurra-prashanth-91908a151/



SOLAR POLICY FOR KERALA - Residential, Commercial & Industrial

1. NET METERING -
Net metering is a billing system that allows rooftop owners having solar system installed at their rooftop to sell any excess electricity generated from solar system to local electricity utility
Capacity - Min 1 kWp, Max 1 MWp
Conditions: Cumulative capacity of all solar systems installed in your area shall not exceed 30% of distribution transformer capacity in your area LT systems and 80% for HT systems.


Kerala's Solar target set at 1,870 MW by 2022

The total installed capacity of the state, all sources in the state included, is now just shy of 3,000 MW. The KSEB alone expects to complete 15 solar power projects with a total installed capacity of 9.2 MW in 2018-19. Majority of these are rooftop solar plant projects in schools, government buildings and local bodies. In addition to these, the KSEB has also launched paperwork on seven other solar power projects. Of the 200 MW Kasargod solar project, a 50 MW component is already functional. Moreover, the KSEB has also given conditional clearance for purchasing electricity generated at the proposed 170 MW solar project planned by NTPC Ltd at Kayamkulam, according to Electricity Minister M M Mani. ANERT pursues three separate schemes for generation of solar power using rooftop plants.
ANERT is now promoting the Renewable Energy Service Company (RESCO) model in the state for encouraging government hospitals and establishments to take up solar projects. The big attraction of this model, which is promoted by the Solar Energy Corporation of India (SECI), is the government agencies will not have to make any initial investment.


Practical Training Photo Gallery

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Interactive Classes

Interactive Classes

Practical & Doubt Classes

Practical & Doubt Classes

E-Library Study Materials

E-Library Study Materials

Online Examination

Online Examination



footer

Contact Us