Kottayam Solar Project

Kerala Releases Tender For Solar Power Plants worth 12 MW
The Steel Industries Kerala Limited has announced that it has released tender inviting bids for setting up of two on-grid solar PV power plants in Kidangoor Gram Panchayat in Kottayam, Kerala. The last date of bid submissions is February 18, 2019, and the bid opening date has been scheduled for February 20, 2018.

All bidders will be requisite to present an Earnest Money Deposit of Rs 25,000 along with their bids. The projected cost of the project is Rs 9,00,000 and the selected bidders will have 45 days to execute the project.

The two solar rooftop plants of 9 kW and 3 kW capacity will be set up at the Gram Panchayat of Kidangoor in the Kottayam District of Kerala. To be entitled, the bidders should have prior experience in accomplishing related projects and the experience certificate should be uploaded along with the bids.


Warning: include(../../../bangalore/branch_address.php): failed to open stream: No such file or directory in /home/pvistgtsr23/public_html/branch/south-india/kerala/kottayam.php on line 47

Warning: include(../../../bangalore/branch_address.php): failed to open stream: No such file or directory in /home/pvistgtsr23/public_html/branch/south-india/kerala/kottayam.php on line 47

Warning: include(): Failed opening '../../../bangalore/branch_address.php' for inclusion (include_path='.:/opt/remi/php74/root/usr/share/pear:/opt/remi/php74/root/usr/share/php:/usr/share/pear:/usr/share/php') in /home/pvistgtsr23/public_html/branch/south-india/kerala/kottayam.php on line 47


Offline classroom class Jul & Aug - 2024 at IST Hosur (TN). Submit Registration


Quick Inquiry Form

Select Mail Subject *
Select Course *
Select Course Mode *
Select Admission For *
Full Name *
Email ID *
Full Address *
Zip/Pin Number *
WhatsApp No (with country code)*




Are you Professional? *
Select Years of Experience *
Describe your needs/Future Plan *

IST Alumni Feedback

JITESH GAJBHIYE

Good platform for Basics to Technically in-depth Knowledge of Solar

- JITESH GAJBHIYE,
Deputy Ex. Engineer at Maharashtra State Electricity Transmission Co Ltd

Rohit Agarwal

Outstanding entry level learning in solar pv industry. Wish to learn more in R&D sector of Solar PV. Most important part of this course was diffrent type PV power plant design calculation, solving multiple examples.

- Rohit Agarwal,
Partner, Ganesh Engineering Workshop

ANWAR P I

A great place to gain good quality of knowledge. Course content is great for beginners and people working in this field. In depth training, great instructor. We hope IST will continue to support us in our future journey.

- ANWAR P I,
Site engineer at Nesma trading

Isaac Farayi (Zambabwe)

The presenter had a very good l knowledge of the solar business in India as well as of Solar Technology so I got some very good ideas that can also apply to my market. Understanding the solar system especially the DC part as well as the whole planing and feasibility process. Coming from an Ac background and working with some solar technologies from time to time I realized that there was so much I had been missing. I am now more confident to tackle the solar market. They helped consolidate the lectures on design as well as appreciate practical aspects of wiring as well as mechanical installation. lST very well structured and comprehensive programme. Excellent investment for anyone wanting to venture into Solar business.

- Isaac Farayi (Zambabwe),
Director at Africa Infrastructure Consultancy

VINAYAKRAO NADKARNI

IST is an Excellent Institute with practical approach. Teachers follow very efficient way of teaching and solving multiple case studies.

- VINAYAKRAO NADKARNI,
MAINTENANCE MANAGER at NATIONAL OIL COMPANY, UAE




SOLAR POLICY FOR KERALA - Residential, Commercial & Industrial

1. NET METERING -
Net metering is a billing system that allows rooftop owners having solar system installed at their rooftop to sell any excess electricity generated from solar system to local electricity utility
Capacity - Min 1 kWp, Max 1 MWp
Conditions: Cumulative capacity of all solar systems installed in your area shall not exceed 30% of distribution transformer capacity in your area LT systems and 80% for HT systems.


Kerala's Solar target set at 1,870 MW by 2022

The total installed capacity of the state, all sources in the state included, is now just shy of 3,000 MW. The KSEB alone expects to complete 15 solar power projects with a total installed capacity of 9.2 MW in 2018-19. Majority of these are rooftop solar plant projects in schools, government buildings and local bodies. In addition to these, the KSEB has also launched paperwork on seven other solar power projects. Of the 200 MW Kasargod solar project, a 50 MW component is already functional. Moreover, the KSEB has also given conditional clearance for purchasing electricity generated at the proposed 170 MW solar project planned by NTPC Ltd at Kayamkulam, according to Electricity Minister M M Mani. ANERT pursues three separate schemes for generation of solar power using rooftop plants.
ANERT is now promoting the Renewable Energy Service Company (RESCO) model in the state for encouraging government hospitals and establishments to take up solar projects. The big attraction of this model, which is promoted by the Solar Energy Corporation of India (SECI), is the government agencies will not have to make any initial investment.


Practical Training Photo Gallery

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Lights
Nature
Fjords

Interactive Classes

Interactive Classes

Practical & Doubt Classes

Practical & Doubt Classes

E-Library Study Materials

E-Library Study Materials

Online Examination

Online Examination



footer

We are inviting you to become Authorized Training Centers (ATC), Authorized Lab Centers (ALC), Certified Instructor and Authorized Career Counsellor (ACC)

Submit Request

Contact Us